stars 1 stars 2 stars 3

WeStorix develops and operates Green Power Stations with integrated battery energy storage system (BESS) and a local optimization layer. We see it as the missing link in the green transition - a strategic bridge between grid infrastructure, local renewable generation, and large energy consumers. Each Green Power Station forms a grid-connected Energy Campus, combining a high-voltage substation, advanced power conversion, and a large-scale BESS, through dedicated back-feed connections, local renewables and consumers are directly integrated, enabling a decentralized, grid-connected Energy Campus. Each Energy Campus enhances grid flexibility and resilience, while enabling real-time balancing and optimization of energy production and consumption – accelerating electrification and decarbonization. To operate each Energy Campus efficiently, we run a centralized Energy Management and Trading Center, powered by intelligent software that unlocks value through energy arbitrage, ancillary services, and economic optimization across the entire energy value chain. We are currently developing Energy Campuses in Denmark, totalling more than 800 MWh of storage capacity - with a global pipeline underway - planning to add 1 GWh of new capacity annually - hence creating tangible impact in grid stability, renewable integration, and industrial electrification.

Website https://www.westorix.com/
Employees 9 (6 on RocketReach)
Founded 2023
Industry Services for Renewable Energy

WeStorix Questions

Tony Breach is the CEO and Founder of WeStorix.

6 people are employed at WeStorix.

Top WeStorix Employees

View Similar People
G2 Leader Summer 2026 G2 Best Est ROI Mid-Market Summer 2026 G2 Easiest Admin Mid-Market Summer 2026 G2 Most Implementable Summer 2026 G2 Best Results Mid-Market Summer 2026 G2 Lead Capture Mid-Market Summer 2026 Inc Fastest Growing Private Companies 2026 Inc Best Workplace 2026
g2crowd
G2Crowd Trusted
chromestore
300K+ Plugin Users