Wafflemat Foundation System is the world’s leading foundation system for building on expansive, compressible, collapsible, and rocky soils, with millions of square feet of residential and light commercial space built across the United States since 1993 – all without a single structural failure. It is also one of the easiest, and in terms of cycle time, fastest to construct, taking 4 – 5 days vs. 10 – 14 for alternative slabs. Wafflemat Systems conforms to both International Building Code and Post Tension Institute specifications.
| Website | https://wafflemat.com/ |
| Employees | 3 (2 on RocketReach) |
| Address | 201 Players Circle Suite 150, Southlake, Texas 76092, US |
| Phone | +1 855-923-3628 |
| Industry | Construction |
| Keywords | Soil Stabilization, Ground Improvement, Ground Stabilization, Geotechnical Engineering, Soil Compaction, Soil Mechanics, Structural Support, Foundation Design, Foundation Repair, Geosynthetics |
| Competitors | Waffle House, Inc., Waffle Time Group of Companies, Belgian Waffle Works, Waffle Me Up, PancakeBot, Families day out, Waffle Wagon (view competitors) |
Looking for a particular Wafflemat employee's phone or email?
Anna Olveda is the VP of Engineering of Wafflemat.
2 people are employed at Wafflemat.
Wafflemat is based in Southlake, Texas.