stars 1 stars 2 stars 3

The West African Power Pool (WAPP) organization was established by the highest decisionmaking body of ECOWAS, the Authority of Heads of State and Government of Member States, as a mechanism and institutional framework for integrating the national power systems of ECOWAS member countries. The objective of the WAPP is to establish a regional electricity market in West Africa through the judicious development and realization of key priority infrastructure that would permit the accessibility to economic energy resources, to all member states of the ECOWAS and help meet the energy needs of the ECOWAS citizens by providing least cost reliable and sustainable electricity supply for economic development. The Implementation Strategy of WAPP is based on developing complementary and mutually reinforcing infrastructure sub-programs, which will result in an integrated electricity system and market in West Africa. It is funded by the World Bank (WB), the African Development Bank (AfDB), the European Investment Bank (EIB) and the KFW. Among the infrastructure sub-programs to be developed by the WAPP, there is the electrical interconnection between Côte d'Ivoire, Liberia, Sierra Leone and Guinea (CLSG). This project aims to integrate these post-conflict countries in the regional electricity market created by the WAPP. In conformity with the above-mentioned enactment, the four countries have duly signed and ratified an International Treaty establishing a Regional Transmission Company (RTC) known as TRANSCO CLSG with the mandate to finance, construct, own, operate and further develop the CLSG transmission interconnector. CLSG project will give the following results: ● A 225-kV overhead transmission line of approximately 1,303 km across the four countries involved; ● Eleven (11) new 225 kV substations, five (5) in Liberia and one (1) in Guinea. ● Extension of an existing substation in Côte d’Ivoire; ● Installation of Static VAr Compensators at five substations

TRANSCO CLSG Questions

The TRANSCO CLSG annual revenue was $26.6 million in 2026.

21 people are employed at TRANSCO CLSG.

The NAICS codes for TRANSCO CLSG are [5413, 541, 54, 54131].

The SIC codes for TRANSCO CLSG are [87, 871].

G2 Leader Summer 2026 G2 Best Est ROI Mid-Market Summer 2026 G2 Easiest Admin Mid-Market Summer 2026 G2 Most Implementable Summer 2026 G2 Best Results Mid-Market Summer 2026 G2 Lead Capture Mid-Market Summer 2026 Inc Fastest Growing Private Companies 2026 Inc Best Workplace 2026
g2crowd
G2Crowd Trusted
chromestore
300K+ Plugin Users