stars 1 stars 2 stars 3

Tideway's Super Sewer is upgrading London's infrastructure to cope with demands well into the 22nd century and reconnecting the city with the iconic River Thames. The Thames Tideway Tunnel is a 25 kilometre interception, storage and transfer tunnel running up to 65 metres below the river. Starting in west London, the main tunnel generally follows the route of the River Thames to Limehouse, where it then continues north-east to Abbey Mills Pumping Station near Stratford. There it will be connected to the Lee Tunnel, which will transfer the sewage to Beckton Sewage Treatment Works. Overflows of untreated sewage into the River Thames add up to tens of millions of tonnes every year. London's sewerage system relies on an integrated network of combined sewer overflows (CSOs). At the time it was built, the CSOs would release flows through discharge points along the river during heavy storms. Originally, this would happen once or twice a year, it now happens on a weekly basis and no longer requires a storm to trigger overflows. By intercepting the sewage before it enters the river, the Thames Tideway Tunnel will help prevent the River Thames from being polluted with untreated sewage which can stay in the river for up to three months before the ebb and flow of the tide finally takes it out to sea. For more information, visit our website www.tideway.london Tideway Inclusive Recruitment statement: We are one of The Times Top 50 Employers for Women, a Stonewall Diversity Champion, a proud signatory of the ‘Ban the Box’ campaign, and Disability Confident Committed Employer. We pride ourselves on providing employment for disabled employees, providing support and adjustments during the recruitment process, and wherever needed in the working environment. We offer a guaranteed interview scheme for suitably qualified disabled applicants.

View Top Employees from Tideway London
Website http://www.tideway.london
Employees 296 (296 on RocketReach)
Founded 2013
Technologies
Industry Construction, Energy Infrastructure, Waste water services, Construction and Engineering
Web Rank 2 Million
Keywords Tideway, Tideway London, Thames Tideway, Tideway London Jobs, Thames Tideway Tunnel

Tideway London Questions

Mathew Duncan is the CFO of Tideway London.

296 people are employed at Tideway London.

Top Tideway London Employees

View Similar People
How It Works
Get a Free Account
Sign up for a free account. No credit card required. Up to 5 free lookups / month.
Search
Search over 700 million verified professionals across 35 million companies.
Get Contact Info
Get contact details including emails and phone numbers (business & personal).
High Performer Summer 2022 RocketReach is a leader in Lead Intelligence on G2 RocketReach is a leader in Lead Intelligence on G2 RocketReach is a leader in Lead Intelligence on G2
talentculture2022
g2crowd
G2Crowd Trusted
chromestore
300K+ Plugin Users