Florida’s waterfront future cannot depend on endlessly replacing seawalls. SEALOR is developing a new approach: strengthening and sealing the ground that keeps them standing. This NSF-backed Florida company harnesses nature’s limestone-building process through an injectable treatment that binds sand and porous limestone into a stronger, less permeable solid limestone rock, targeting the underground seepage and soil loss that undermine seawalls. Delivered through established grouting methods, the technology is designed to extend infrastructure life while reducing disruption, demolition, and reliance on new concrete and heavy excavation operations. Laboratory testing has demonstrated dramatic reductions in permeability and a doubling of compressive strength, with outdoor mesocosm testing now underway. Seawalls are the first market; the broader opportunity spans pollution control, flood protection, and saltwater intrusion control.
| Website | http://www.sealor.com |
| Employees | 6 (0 on RocketReach) |
| Founded | 2024 |
| Address | 936 SW 1st Ave 248, Miami, Florida 33130, US |
| Industry | Climate Technology Product Manufacturing |
Looking for a particular Sealor employee's phone or email?
Sealor is based in Miami, Florida.