stars 1 stars 2 stars 3

The outcome of Vision 2020 has resulted in the establishment of Oman’s first LNG plant, ‘Oman LNG’ in 1994. In 2002, the Government of Oman decided to move forward with plans to develop a third gas liquefaction train and thus ‘Qalhat LNG’ was born and was incorporated in 2003. Today the Government of Oman owns 46.84% of Qalhat LNG, while Oman LNG owns 36.80% and Union Fenosa Gas of Spain owns 7.36%. US$ 700 million has been invested for the engineering, procurement and construction of this 3.30 mtpa liquefaction train. This train is built to the same specifications, and utilizing similar technical design and construction, as the existing two liquefaction trains. The capacity of the Qalhat LNG Plant is anticipated to increase to at least 3.70 mtpa after 18 months of its operation. It’s worth mentioning that the project was completed ahead of the scheduled time and below the allocated budget. Moreover, it has achieved more than 38% Omanisation, the highest recorded for any construction project in the Sultanate with a safety achievement of 20 million man-hours without any Lost Time Injuries (LTI).

Qalhat LNG Questions

The Qalhat LNG annual revenue was $27.1 million in 2026.

4 people are employed at Qalhat LNG.

Qalhat LNG is based in Al Khubayb, Al Buraimi.

The NAICS codes for Qalhat LNG are [211, 21, 22, 221].

The SIC codes for Qalhat LNG are [49, 13, 132].

G2 Leader Summer 2026 G2 Best Est ROI Mid-Market Summer 2026 G2 Easiest Admin Mid-Market Summer 2026 G2 Most Implementable Summer 2026 G2 Best Results Mid-Market Summer 2026 G2 Lead Capture Mid-Market Summer 2026 Inc Fastest Growing Private Companies 2026 Inc Best Workplace 2026
g2crowd
G2Crowd Trusted
chromestore
300K+ Plugin Users