Pecos Wind Power designs, builds, and sells wind turbines for distributed generation. We are currently developing the PW85 turbine, an 85kW wind turbine that will break down the barriers to distributed wind power making wind power more accessible to schools, businesses, and towns. We are taking an engineering approach to reducing turbine LCOE, increasing capacity factors, and enabling innovative business models to make the switch to wind a financially smart and hassle free decision.
View Top Employees from Pecos Wind PowerWebsite | http://pecoswindpower.com |
Employees | 4 (4 on RocketReach) |
Technologies |
JavaScript,
HTML,
PHP
+19 more
(view full list)
|
Industry | Design, Renewables & Environment |
Looking for a particular Pecos Wind Power employee's phone or email?
James Forte is the Vice President Engineering of Pecos Wind Power.
4 people are employed at Pecos Wind Power.
Pecos Wind Power is based in Cambridge, Massachusetts.