InQuik® bridge system is a suitable option for 80% of Australian bridges. InQuik has supplied over 200 bridges around New South Wales, Victoria, Queensland, and the Pacific. 🌏 InQuik® is an in-situ poured semi-modular reinforced concrete bridge system. It has exceptional resilience to impacts caused by severe weather events and requires minimum to no structural maintenance over its 100-year design life. InQuik® provides environmentally friendly long-lasting solutions for Communities, and enables the use of local resources, on-site labour, plant, and materials. 🐟🌱 🔧Founded by Bruce Mullaney, a builder, farmer, and inventor from the Southern Tablelands, InQuik introduces a patented method for constructing concrete slabs, enabling the remarkable InQuik® Bridging System. 🏗️ InQuik bridges are designed for containerized shipping, facilitating transportation to developing nations and remote locations. InQuik enables Governments, Councils, Disaster relief agencies and Road authorities to upgrade or construct infrastructure, cost-effectively and efficiently. 4 Fabrication facilities around Australia. ISO 9001, ISO 14001, ISO 45001 JAS-ANZ Member of the Association of Iron & Steel Technology 🏆Winner Association of Iron & Steel Technology (AIST) 2019 TC Graham Prize for innovation 🏆Winner Accelerated Bridge Construction (ABC) Conference – Most Innovative Accelerated Bridge Construction System. 2021 🏆Winner – Austroads Bridge Conference 2022 – Most Innovative Project. 🏆Finalist in Sir William Hudson Award – Australian Engineering Excellence Awards 2020. Head office: Pyrmont, New South Wales, Australia Denver, Colorado, U.S.A
View Top Employees from InQuik Bridging SystemsWebsite | https://www.inquik.com.au |
Revenue | $6.5 million |
Employees | 24 (18 on RocketReach) |
Address | 33-35 Saunders St, Suite 2.02, Pyrmont, New South Wales 2009, AU |
Phone | +61 1300 467 845 |
Industry | Highway, Street, and Bridge Construction, Construction General, Construction |
Competitors | BridgePro Engineering Pty Ltd, Masta Concrete, Premier Steel Technologies, Ras Formwork |
SIC | SIC Code 16 Companies, SIC Code 162 Companies |
NAICS | NAICS Code 23 Companies, NAICS Code 237 Companies |
Looking for a particular InQuik Bridging Systems employee's phone or email?
The InQuik Bridging Systems annual revenue was $6.5 million in 2024.
Michael Wright is the Director of Technology and Innovation of InQuik Bridging Systems.
18 people are employed at InQuik Bridging Systems.
InQuik Bridging Systems is based in Pyrmont, New South Wales.
The NAICS codes for InQuik Bridging Systems are [23, 237].
The SIC codes for InQuik Bridging Systems are [16, 162].