stars 1 stars 2 stars 3

Construction of the new US 181 Harbor Bridge Project (HBP) is the culmination of years of research, dedication, collaboration, and public participation involving many local entities under the leadership and direction of the Texas Department of Transportation (TxDOT). Joint venture partners Flatiron/Dragados, LLC. (FDLLC) are the developers responsible for replacing the existing Harbor Bridge and reconstructing portions of US 181, IH 37, and SH 286 (Crosstown Expressway). The project includes developing, designing, constructing, and maintaining 6.44 miles of bridge and connecting roadway. The bridge comprises six-lane sections of US 181, three lanes in each direction with a median, barrier, shoulders, and a bicycle and pedestrian shared-use path. Once the new Cable-Stayed Bridge opens to commuters in 2025, phase two construction will begin with demolishing the existing Harbor Bridge and connecting roadways.

Website https://harborbridgeproject.com
Employees 2 (2 on RocketReach)
Industry Construction

Harbor Bridge Project Questions

2 people are employed at Harbor Bridge Project.

Top Harbor Bridge Project Employees

View Similar People
G2 Leader Summer 2026 G2 Best Est ROI Mid-Market Summer 2026 G2 Easiest Admin Mid-Market Summer 2026 G2 Most Implementable Summer 2026 G2 Best Results Mid-Market Summer 2026 G2 Lead Capture Mid-Market Summer 2026 Inc Fastest Growing Private Companies 2026 Inc Best Workplace 2026
g2crowd
G2Crowd Trusted
chromestore
300K+ Plugin Users