Project Manager - 20K HPHT Development @ (September 2021 - July 2023)
Sr. Completion Engineer (Consultant) @ (August 2021 - October 2021)
Project Manager @ (April 2020 - September 2021)
Sr. Completion Engineer (Consultant) @ (November 2019 - April 2020)
Sr. Completions Engineer (Consultant) - 20K HPHT Development @ (September 2014 - September 2019)
Sr. Completions Engineer (Consultant) @ (October 2006 - September 2014)
WH Technology and Technical Support Manager @ SPS International (March 2004 - August 2006)
Sr. Applications Engineer @ SPS International (July 2001 - March 2004)
Subsea Completion Engineer @ (January 1998 - July 2001)
Engineer in Development @ (September 1989 - January 1998)
Gregory Dickerson Education
University of Southern California
Bachelor of Science - BS (Petroleum Engineering)
1984-1989
Gregory Dickerson Skills
A-Annulus Management
A-Annulus Pressure Build-up Principles
Completion
Completion/Packer Fluids
Completions
Control Line Design & Manufacturing
Corrosion/Erosion Principles
Corrosive Gases & Impact to Well Design
Deepwater
Deepwater Rig Equipment
Downhole Flow Control
Drilling
Drilling Engineering
Field Development
Flow Assurance Risks
Formation Evaluation
Injection Water Options & Impacts
Life of Well Loads Critical to Tubing Design
Material Properties
Material Selection
Multi-zone Water Injection Challenges
Offshore Drilling
Oil & Gas
Oil & Gas Industry
Oil/Gas
Oilfield
Onshore
Perforating Principles & Techniques
Petroleum
Petroleum Engineering
Reservoir Engineering
Reservoir Management
Sand Control Techniques & Design
Subsea Tree Systems
Thermal Effects in Producers/Water injectors
Tubing Design
Upstream
Well Abandonment Considerations
Well Barriers & Use
Well Control Principles & Equipment
Well Intervention Techniques
Well Start-up & Shut Down Impact on Sand Control
WellCat Proficient
Wellbore Cleanout & Displacement
Wet vs. Dry Tree Completion Sequences
Workstring & Landing String Design
Multi Zone Water Injection Challenges
Control Line Design And Manufacturing
Injection Water Options And Impacts
Wellbore Cleanout And Displacement
Corrosive Gases And Impact To Well Design
Well Barriers And Use
Sand Control Techniques And Design
Workstring And Landing String Design
Well Control Principles And Equipment
A Annulus Management
Well Start Up And Shut Down Impact On Sand Control
A Annulus Pressure Build Up Principles
Perforating Principles And Techniques
Oil and Gas
Gregory Dickerson Summary
Gregory Dickerson, based in Cypress, TX, US, is currently a Wells Design Engineer (Consultant) at Oxy. Gregory Dickerson brings experience from previous roles at Schlumberger, Southwestern Energy, Thakkar Development Company and ExxonMobil. Gregory Dickerson holds a 1984 - 1989 Bachelor of Science - BS in Petroleum Engineering @ University of Southern California. With a robust skill set that includes A-Annulus Management, A-Annulus Pressure Build-up Principles, Completion, Completion/Packer Fluids, Completions and more.
Looking for a different Gregory Dickerson?
Find contact details for 700 million professionals.