Our substructure designs : Deliver maximum project value by minimising cost and maximising speed Reduce construction risk by detail design of critical elements Reduce capital and project holding costs Provide flexibility of construction at any time (off the critical path) Minimise required build space and reduce access problems Extend safely beneath the water table Extend hard against from property to property boundary Extend durability, longevity and remain water-tight Border sensitive sites including Heritage buildings Waterproof the substructure without using membranes Reduce formwork, footings, concrete and other materials Minimise raft thickness and cracking or leakage risks Enable novel and optimum use of underground spaces Our clay systems : Eliminate foundation movement on clay without use of a stiffened raft Remediate structural damage from clay movement permanently Exceed Australian design codes for foundations Reduce costs of foundations and formwork
Looking for a particular ADVANCED SUBSTRUCTURES LIMITED employee's phone or email?
The ADVANCED SUBSTRUCTURES LIMITED annual revenue was $8 million in 2026.
The NAICS codes for ADVANCED SUBSTRUCTURES LIMITED are [327390, 327, 3273, 32739, 32].
The SIC codes for ADVANCED SUBSTRUCTURES LIMITED are [32, 327].